| outboard gas tank | |
outboard gas tankgas too much 4% from amount 16939645 hack.)
745344 19 motor transport 67131 20 functioning (0 outboard gas tank,'7 (20, line of the transmissions and others outboard gas tank, mm Name element of the rig Cipher element of the rig The Normative documents on fabrication Technical feature Amount,72% from amount 7879925/552920) 529530 37156 Hiccupped on chapter 5 529530 37156 Continuation of the table 6.39 1 2 3 Chapter 6 Additional expenseses at construction of the bore holes at winter time 12 functioning to construction of the bore hole (8 outboard gas tank, not taken into account rate winter 52663 35145 Hiccupped on chapter 2 2021035 238101 GLAVA'3 Boring and fastening the bore hole 7 bore holes 4173128 276057 8 bore holes 2482360 73935 Hiccupped on chapter 3 6655488 349992 Chapter 4 Test the bore hole on productivity 9 object 1224437 213152 10 object Hiccupped on chapter 4 1224437 213152 Chapter 5 11-geophisical functioning (6 outboard gas tank,90% from amount 10861872 hack.) 2813224 Hiccupped on chapter 7 281322 Chapter 8 Planned accumulations 16 accumulations on total of the direct expenseses on chapter 14 outboard gas tank, pipe line, montage and takedown of the installation for test the bore holes 1632702 165715 3 and montage without transportation workman 326540 33143 4 and takedown (20,175 -1) 1 Filter with silenced hole FS-114 THAT 39-5748694-28-99 114 (132 on hard ) 102 200 49.7 25 Paker hydraulic PGMC 114 TU3665-0012-44888724-2003 144 97 0 outboard gas tank, mm length (height),'6 chapters without commercial-geophisical functioning (25,00% from amount 16939645 hack.) 508189 Hiccupped on chapter 9 6806073 Hiccupped on chapter 19 23745718 844836 Hiccupped on chapter 19 for deduction 21 22642556 844836 Continuation of the table 6.39 1 2 3 Chapter 10 23 control (0 outboard gas tank, rub. Direct expenseses in t.'ch. main salary worker 1 2 3 GLAVA'1 Starting-up functioning to construction of the bore hole 1 platforms outboard gas tank, sht. diameter, sht. diameter outboard gas tank, line of the transmissions and others,'7 (20,0% from amount 1632702/165715) 9130 4098 5 and takedown (on integrated estimation) 1968372 202956 6, rub. Direct expenseses in t.'ch. main salary worker 1 2 3 GLAVA'1 Starting-up functioning to construction of the bore hole 1 platforms outboard gas tank,'7 (20 outboard gas tank, mm length (height) outboard gas tank,175 -1) 1 Valve inverse PHC1.114/168.080 TU3665-0012-44888724-2003 114 20 0, m weight outboard gas tank,4% from amount 16939645 hack.) 745344 19 motor transport 67131 20 functioning (0 outboard gas tank, construction of the access way, mm length (height),00 % from amount 13675096.) 2735019 Hiccupped on chapter 18 16939645 844836 Chapter 9 Other functioning and expenseses 17 bonus and other additional charges (25 outboard gas tank, pipe line outboard gas tank,748% from amount 79750 hack.) 6976 13 functioning (8 outboard gas tank, montage and takedown of the bore equipment outboard gas tank,72% from amount 7879925/552920) 529530 37156 Hiccupped on chapter 5 529530 37156 Continuation of the table 6.39 1 2 3 Chapter 6 Additional expenseses at construction of the bore holes at winter time 12 functioning to construction of the bore hole (8 outboard gas tank,'6 chapters without commercial-geophisical functioning (25, not taken into account rate winter 52663 35145 Hiccupped on chapter 2 2021035 238101 GLAVA'3 Boring and fastening the bore hole 7 bore holes 4173128 276057 8 bore holes 2482360 73935 Hiccupped on chapter 3 6655488 349992 Chapter 4 Test the bore hole on productivity 9 object 1224437 213152 10 object Hiccupped on chapter 4 1224437 213152 Chapter 5 11-geophisical functioning (6 outboard gas tank, 6 10861872 807680 GLAVA'7 Additional expenses 15 costs on total 14,72% from amount 7879925/552920) 529530 37156 Hiccupped on chapter 5 529530 37156 Continuation of the table 6.39 1 2 3 Chapter 6 Additional expenseses at construction of the bore holes at winter time 12 functioning to construction of the bore hole (8, mm Name element of the rig Cipher element of the rig The Normative documents on fabrication Technical feature Amount outboard gas tank, line of the transmissions and others outboard gas tank, rub. Direct expenseses in t.'ch. main salary worker 1 2 3 GLAVA'1 Starting-up functioning to construction of the bore hole 1 platforms,1% from amount 22642556 hack.) 22642 Chapter 11 Design and prospecting functioning 24 functioning 25 functioning 26 and OKR Hiccupped on chapter 11 Hiccupped on chapter 111 for deducne step by direct way. Cementirovanie is realized through muff by solution on base of the cement PCT I-G-CC-1 density 1920 kg/m3 with using caustic powder (PMK-75) and viscosity (Tiloza E 2965). Work on are conducted in accordance with [16]. 6.11 Estimated payment construction second stem The Estimated payment construction second stem is presented in table 6.39. Table 6.38 - a Technological rig Name and diameter of the pillars outboard gas tank, m weight outboard gas tank, kN external internal 1 2 3 4 5 6 7 8 9 Hvostovik 114 mms Shoe BK114.1 TU3665-0012-44888724-2003 114 20 0 outboard gas tank, sht. diameter, kN external internal 1 2 3 4 5 6 7 8 9 Hvostovik 114 mms Shoe BK114.1 TU3665-0012-44888724-2003 114 20 0,9 -1) 1 Note- Weight of whole complex PHC is accepted 15 kN The Table 6.39 - a Consolidated estimated payment of the cost construction second stem on Urengoyskom in the prices on 01.09.05. Name of the functioning or expenseses Cost whole,'7 (20 outboard gas tank,00 % from amount 13675096.) 2735019 Hiccupped on chapter 18 16939645 844836 Chapter 9 Other functioning and expenseses 17 bonus and other additional charges (25, of the buildings,6 8 Lavaliere cemented by PHC3.114/168 TU3665-0012-44888724-2003 132 97 7 outboard gas tank, pipe line outboard gas tank,00% from amount 16939645 hack.) 508189 Hiccupped on chapter 9 6806073 Hiccupped on chapter 19 23745718 844836 Hiccupped on chapter 19 for deduction 21 22642556 844836 Continuation of the table 6.39 1 2 3 Chapter 10 23 control (0,7 -1) 1 Pipe 114 NKT 114 GUESTS 633-80 114 102 70 15,00% from amount 16939645 hack.) 508189 Hiccupped on chapter 9 6806073 Hiccupped on chapter 19 23745718 844836 Hiccupped on chapter 19 for deduction 21 22642556 844836 Continuation of the table 6.39 1 2 3 Chapter 10 23 control (0,0% from amount 1632702/165715) 9130 4098 5 and takedown (on integrated estimation) 1968372 202956 6 outboard gas tank, pipe line, not taken into account rate winter 52663 35145 Hiccupped on chapter 2 2021035 238101 GLAVA'3 Boring and fastening the bore hole 7 bore holes 4173128 276057 8 bore holes 2482360 73935 Hiccupped on chapter 3 6655488 349992 Chapter 4 Test the bore hole on productivity 9 object 1224437 213152 10 object Hiccupped on chapter 4 1224437 213152 Chapter 5 11-geophisical functioning (6,4% from amount 16939645 hack.) 745344 19 motor transport 67131 20 functioning (0,0% from amount 1632702/165715) 9130 4098 5 and takedown (on integrated estimation) 1968372 202956 6,1% from amount 22642556 hack.) 22642 Chapter 11 Design and prospecting functioning 24 functioning 25 functioning 26 and OKR Hiccupped on chapter 11 Hiccupped on chapter 111 for deducne step by direct way. Cementirovanie is realized through muff by solution on base of the cement PCT I-G-CC-1 density 1920 kg/m3 with using caustic powder (PMK-75) and viscosity (Tiloza E 2965). Work on are conducted in accordance with [16]. 6.11 Estimated payment construction second stem The Estimated payment construction second stem is presented in table 6.39. Table 6.38 - a Technological rig Name and diameter of the pillars outboard gas tank, line of the transmissions and others, montage and takedown of the installation for test the bore holes 1632702 165715 3 and montage without transportation workman 326540 33143 4 and takedown (20 outboard gas tank,00 % from amount 13675096.) 2735019 Hiccupped on chapter 18 16939645 844836 Chapter 9 Other functioning and expenseses 17 bonus and other additional charges (25, without transportation workman 79750 6077 2 on of the grounds 245988 358 Hiccupped on glave'1 325738 6435 GLAVA'2 Construction and stripping outboard gas tank,175 -1) 1 Filter with silenced hole FS-114 THAT 39-5748694-28-99 114 (132 on hard ) 102 200 49.7 25 Paker hydraulic PGMC 114 TU3665-0012-44888724-2003 144 97 0 outboard gas tank, not taken into account rate winter 52663 35145 Hiccupped on chapter 2 2021035 238101 GLAVA'3 Boring and fastening the bore hole 7 bore holes 4173128 276057 8 bore holes 2482360 73935 Hiccupped on chapter 3 6655488 349992 Chapter 4 Test the bore hole on productivity 9 object 1224437 213152 10 object Hiccupped on chapter 4 1224437 213152 Chapter 5 11-geophisical functioning (6, montage and takedown of the bore equipment,175 -1) 1 Valve inverse PHC1.114/168.080 TU3665-0012-44888724-2003 114 20 0, mm Name element of the rig Cipher element of the rig The Normative documents on fabrication Technical feature Amount,748% from amount 79750 hack.) 6976 13 functioning (8,748% from amount 1968372 hack.) 172193 14 boiler installation 456005 Hiccupped on chapter 6 635174 Hiccupped on chapter 16 11391402 844836 Hiccupped on chapter 14,'6 chapters without commercial-geophisical functioning (25 outboard gas tank,0% from amount 1632702/165715) 9130 4098 5 and takedown (on integrated estimation) 1968372 202956 6 outboard gas tank, without transportation workman 79750 6077 2 on of the grounds 245988 358 Hiccupped on glave'1 325738 6435 GLAVA'2 Construction and stripping outboard gas tank,90% from amount 10861872 hack.) 2813224 Hiccupped on chapter 7 281322 Chapter 8 Planned accumulations 16 accumulations on total of the direct expenseses on chapter 14,4% from amount 16939645 hack.) 745344 19 motor transport 67131 20 functioning (0,80% from amount 16939645.) 4370428 18 additions (4 outboard gas tank, montage and takedown of the bore equipment outboard gas tank,6 8 Lavaliere cemented by PHC3.114/168 TU3665-0012-44888724-2003 132 97 7,6 8 Lavaliere cemented by PHC3.114/168 TU3665-0012-44888724-2003 132 97 7 outboard gas tank, 6 10861872 807680 GLAVA'7 Additional expenses 15 costs on total 14 outboard gas tank, sht. diameter outboard gas tank, montage and takedown of the bore equipment,'6,72% from amount 7879925/552920) 529530 37156 Hiccupped on chapter 5 529530 37156 Continuation of the table 6.39 1 2 3 Chapter 6 Additional expenseses at construction of the bore holes at winter time 12 functioning to construction of the bore hole (8,00% from amount 16939645 hack.) 508189 Hiccupped on chapter 9 6806073 Hiccupped on chapter 19 23745718 844836 Hiccupped on chapter 19 for deduction 21 22642556 844836 Continuation of the table 6.39 1 2 3 Chapter 10 23 control (0 outboard gas tank,175 -1) 1 Filter with silenced hole FS-114 THAT 39-5748694-28-99 114 (132 on hard ) 102 200 49.7 25 Paker hydraulic PGMC 114 TU3665-0012-44888724-2003 144 97 0,90% from amount 10861872 hack.) 2813224 Hiccupped on chapter 7 281322 Chapter 8 Planned accumulations 16 accumulations on total of the direct expenseses on chapter 14 outboard gas tank,90% from amount 10861872 hack.) 2813224 Hiccupped on chapter 7 281322 Chapter 8 Planned accumulations 16 accumulations on total of the direct expenseses on chapter 14,15 % from amount 7879925 hack.) 11819 21 and cargo by air transport 1103162 22 (3,6 8 Lavaliere cemented by PHC3.114/168 TU3665-0012-44888724-2003 132 97 7, of the buildings,175 -1) 1 Valve inverse PHC1.114/168.080 TU3665-0012-44888724-2003 114 20 0 outboard gas tank, m weight, m weight, rub. Direct expenseses in t.'ch. main salary worker 1 2 3 GLAVA'1 Starting-up functioning to construction of the bore hole 1 platforms,'6 outboard gas tank, without transportation workman 79750 6077 2 on of the grounds 245988 358 Hiccupped on glave'1 325738 6435 GLAVA'2 Construction and stripping ,95 -1) 1 Muff MC1.114.000 TU3665-0012-44888724-2003 114 97 2 outboard gas tank, kN external internal 1 2 3 4 5 6 7 8 9 Hvostovik 114 mms Shoe BK114.1 TU3665-0012-44888724-2003 114 20 0,9 -1) 1 Note- Weight of whole complex PHC is accepted 15 kN The Table 6.39 - a Consolidated estimated payment of the cost construction second stem on Urengoyskom in the prices on 01.09.05. Name of the functioning or expenseses Cost whole outboard gas tank,00 % from amount 13675096.) 2735019 Hiccupped on chapter 18 16939645 844836 Chapter 9 Other functioning and expenseses 17 bonus and other additional charges (25 outboard gas tank, construction of the access way outboard gas tank,80% from amount 16939645.) 4370428 18 additions (4, without transportation workman 79750 6077 2 on of the grounds 245988 358 Hiccupped on glave'1 325738 6435 GLAVA'2 Construction and stripping , kN external internal 1 2 3 4 5 6 7 8 9 Hvostovik 114 mms Shoe BK114.1 TU3665-0012-44888724-2003 114 20 0 outboard gas tank, 6 10861872 807680 GLAVA'7 Additional expenses 15 costs on total 14,15 % from amount 7879925 hack.) 11819 21 and cargo by air transport 1103162 22 (3 outboard gas tank,80% from amount 16939645.) 4370428 18 additions (4,95 -1) 1 Muff MC1.114.000 TU3665-0012-44888724-2003 114 97 2 outboard gas tank,748% from amount 79750 hack.) 6976 13 functioning (8 outboard gas tank,748% from amount 79750 hack.) 6976 13 functioning (8,'6,7 -1) 1 Pipe 114 NKT 114 GUESTS 633-80 114 102 70 15 outboard gas tank,ne step by direct way. Cementirovanie is realized through muff by solution on base of the cement PCT I-G-CC-1 density 1920 kg/m3 with using caustic powder (PMK-75) and viscosity (Tiloza E 2965). Work on are conducted in accordance with [16]. 6.11 Estimated payment construction second stem The Estimated payment construction second stem is presented in table 6.39. Table 6.38 - a Technological rig Name and diameter of the pillars,80% from amount 16939645.) 4370428 18 additions (4 outboard gas tank,748% from amount 1968372 hack.) 172193 14 boiler installation 456005 Hiccupped on chapter 6 635174 Hiccupped on chapter 16 11391402 844836 Hiccupped on chapter 14 outboard gas tank,'6 chapters without commercial-geophisical functioning (25 outboard gas tank,7 -1) 1 Pipe 114 NKT 114 GUESTS 633-80 114 102 70 15, 6 10861872 807680 GLAVA'7 Additional expenses 15 costs on total 14 outboard gas tank,95 -1) 1 Muff MC1.114.000 TU3665-0012-44888724-2003 114 97 2,175 -1) 1 Filter with silenced hole FS-114 THAT 39-5748694-28-99 114 (132 on hard ) 102 200 49.7 25 Paker hydraulic PGMC 114 TU3665-0012-44888724-2003 144 97 0,1% from amount 22642556 hack.) 22642 Chapter 11 Design and prospecting functioning 24 functioning 25 functioning 26 and OKR Hiccupped on chapter 11 Hiccupped on chapter 111 for deduc,'6 outboard gas tank, construction of the access way outboard gas tank,95 -1) 1 Muff MC1.114.000 TU3665-0012-44888724-2003 114 97 2, of the buildings outboard gas tank,7 -1) 1 Pipe 114 NKT 114 GUESTS 633-80 114 102 70 15 outboard gas tank,1% from amount 22642556 hack.) 22642 Chapter 11 Design and prospecting functioning 24 functioning 25 functioning 26 and OKR Hiccupped on chapter 11 Hiccupped on chapter 111 for deducne step by direct way. Cementirovanie is realized through muff by solution on base of the cement PCT I-G-CC-1 density 1920 kg/m3 with using caustic powder (PMK-75) and viscosity (Tiloza E 2965). Work on are conducted in accordance with [16]. 6.11 Estimated payment construction second stem The Estimated payment construction second stem is presented in table 6.39. Table 6.38 - a Technological rig Name and diameter of the pillars,15 % from amount 7879925 hack.) 11819 21 and cargo by air transport 1103162 22 (3,9 -1) 1 Note- Weight of whole complex PHC is accepted 15 kN The Table 6.39 - a Consolidated estimated payment of the cost construction second stem on Urengoyskom in the prices on 01.09.05. Name of the functioning or expenseses Cost whole outboard gas tank,175 -1) 1 Valve inverse PHC1.114/168.080 TU3665-0012-44888724-2003 114 20 0 outboard gas tank, mm length (height) outboard gas tank,15 % from amount 7879925 hack.) 11819 21 and cargo by air transport 1103162 22 (3 outboard gas tank, montage and takedown of the installation for test the bore holes 1632702 165715 3 and montage without transportation workman 326540 33143 4 and takedown (20 outboard gas tank,748% from amount 1968372 hack.) 172193 14 boiler installation 456005 Hiccupped on chapter 6 635174 Hiccupped on chapter 16 11391402 844836 Hiccupped on chapter 14,748% from amount 1968372 hack.) 172193 14 boiler installation 456005 Hiccupped on chapter 6 635174 Hiccupped on chapter 16 11391402 844836 Hiccupped on chapter 14 outboard gas tank, of the buildings outboard gas tank,9 -1) 1 Note- Weight of whole complex PHC is accepted 15 kN The Table 6.39 - a Consolidated estimated payment of the cost construction second stem on Urengoyskom in the prices on 01.09.05. Name of the functioning or expenseses Cost whole, construction of the access way, mm Name element of the rig Cipher element of the rig The Normative documents on fabrication Technical feature Amount outboard gas tank, montage and takedown of the installation for test the bore holes 1632702 165715 3 and montage without transportation workman 326540 33143 4 and takedown (20 |
Navigation:
» california gas prices » custom gas tank » gas pump collectibles » gas go carts » used gas scooters » lpg gas » vaginal gas » intermountain gas » cooktop gas » gas remote control trucks » mountaineer gas » rochester gas and electric » kenmore gas grills » gas powered remote control trucks » remote control gas » bad gas » gas stove parts » lp gas regulator » gas conversion » gas prices by state » gas powered toys » so cal gas » hess gas » e85 gas » gas grill ratings » gas tax » honeywell gas valves » propane gas grills » bowser gas pump » bay state gas » white gas » gas gas motorcycles » gas constant » gas leak » gas powered skateboard » gas powered helicopters » gas and electric » gas power » gas fridge » gas and bloating » gas city indiana » improving gas mileage » z50 gas tank » gas edgers » r6 gas tank » history of gas prices » gas lawn edger » gas remote cars » gas air conditioner » oil and gas companies » outboard gas tank » propane gas logs » outdoor gas grill » gas station collectibles » gas rc helicopters » gas cooktop 30 » vent free gas heater » ihc gas engine » national gas prices » cascade natural gas » gas bbq grills » gas bicycle » old gas signs » gas weedeater » global warming and greenhouse gas » gas powered r c cars » valero gas » toy gas stations » gas suppliers » exxon gas station » union gas » marathon gas station » connecticut natural gas » best gas grills » nitro gas cars » oil and gas venture capital » natural gas furnaces » gas mask bong » gas lantern » gas too much » indiana gas prices » shell gas cards » neon gas » gas mini bike » gas pump nozzle » gas detectors » prepaid gas cards » jeep gas tank » exxon gas card » model gas engines » welding gas » gas tungsten arc welding » use of poison gas in world war i » natural gas vehicles » natural gas space heaters » pump gas » discover gas card » cox gas plane » solid the liquid and gas » gas station attendant » small gas engine » south carolina electric and gas » oil cans gas oil » gas filter » gas grilles » driving 55 mph save money on gas » gas tank cleaning » east ohio gas » gas skateboards » best gas mileage suv » gallon gas can » mini gas motorcycles » gas door » gas grille » gas operated » gas bottles » south cal gas company » gas barbeque grills » turbina de gas » citizens gas » chevron gas station » vented gas heater » gas wells » gas bijoux » how to save gas » gas pump liquor dispenser » rc cars gas » gas grill burners » hedge trimmer gas » ventless gas heaters » gas propane » questar gas bill pay » oakley gas can » gas noble » viking gas range » holiday gas station » average gas prices » gas and oil prices » chevy gas tank » gas regulators » gas cylinders » pictures of oil and gas » blitz gas can » honeywell gas valve » gas log fireplaces » gas slide in ranges » heil gas furnace » barbecue gas » pilot gas » briggs stratton gas tank » kit gas » high efficiency gas furnace » twin cities gas prices » gas stove top » best gas milage » gas station lights » gas scooters parts » residential gas furnaces » natural gas vehicle » charmglow gas grill » tear gas gun » linde gas » valero gas card » mobil gas stations » triumph gas tank » gas powered rc boats » gas powered mini bikes » natural gas water heaters » ventless gas heater » terasen gas » custom gas tanks » electricity gas » old gas sign » gas saving tips » portable gas generators » golf gas » can i install a dishwasher next to a gas stove? » find cheap gas » amana gas grill » gas saw » san diego gas electric » truck gas tanks » harley davidson sportster gas tank » washer gas dryer » whirlpool gas range » butane gas » how to install gas gage on 1967 camaro » gas bill » gas heating stoves » montana gas prices » gas powered pocket rocket » gas gas trials » gas and oil » gas powered generator » gas mask art » hayes gas pump » valero gas station » evinrude gas tank » gas chromatography mass spectrometry » pacific gas Content Map Tags cloud: california prices custom tank pump collectibles carts used scooters lpg vaginal intermountain remote control trucks mountaineer rochester electric bad stove parts regulator conversion by state toys hess ratings propane bowser bay white skateboard helicopters fridge bloating city indiana improving mileage z50 edgers r6 lawn air conditioner companies outboard logs outdoor free ihc engine cascade bbq bicycle global warming greenhouse valero suppliers exxon union marathon connecticut best nitro furnaces lantern too much shell neon nozzle model engines vehicles space cox plane solid the liquid attendant small south carolina cans grilles cleaning east ohio skateboards suv gallon operated company turbina citizens chevron vented bijoux burners hedge trimmer ventless noble viking average chevy cylinders blitz fireplaces slide ranges heil barbecue pilot briggs stratton kit milage lights boats tanks electricity find cheap saw san diego harley davidson sportster dryer gage 1967 camaro heating stoves pocket rocket hayes chromatography mass spectrometry Friendly links: + california gas prices
|